A model of a reservior is drained in 4 mts by opening the sluice gate. The model scale is 1: 225. How long should it take to empty the prototype ?
Civil Engineeringmedium
A900 minutes
B4 minutes
C4 x (225)3/2 minutes
D4 (225)1/3 minutes E. 4 x V225 minutes