Bio-chemical oxygen demand (BOD) for the first 20 days in generally referred to_______________?
Civil Engineeringmedium
AInitial demand
BFirst stage demand
CCarbonaceous demand
All of these
Correct Answer: D. All of these
Related Questions
Civil Engineering
If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is_________________?
Civil Engineering
Skimming tanks are__________________?
Civil Engineering
The formula which accepts the value of rugosity coefficient n = 0.012 to be used in Manning’s formula, is given by______________________?
Civil Engineering
The sewer which resists sulphide corrosion, is____________________?
Civil Engineering
The rainfall at any place may be determined by__________________?