You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at___________________?
Civil Engineeringmedium
AFull depth
Half full
CTwo third full
DThree fourth full
Correct Answer: B. Half full