The design period of sewage treatment works in normally_________________?
Civil Engineeringmedium
A5 – 10 years
15 – 20 years
C30 – 40 years
D40 – 50 years
Correct Answer: B. 15 – 20 years
Related Questions
Civil Engineering
If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is_________________?
Civil Engineering
Skimming tanks are__________________?
Civil Engineering
The formula which accepts the value of rugosity coefficient n = 0.012 to be used in Manning’s formula, is given by______________________?
Civil Engineering
The sewer which resists sulphide corrosion, is____________________?
Civil Engineering
The rainfall at any place may be determined by__________________?