The design period in years for pumping plants, is___________________?
A1
B2 to 3
C3 to 5
D5 to 10
62
A manhole is generally provided at each__________________?
ABend
BJunction
CChange of gradient
DAll the above
63
A nuisance is experienced in diluting water if dilution factor is less than_________________?
A100
B60
C40
D20
64
If the side of a square sewer is 1000 mm, the diameter of a hydraulically equivalent circular section, is___________________?
A1045 mm
B1065 mm
C1075 mm
D1095 mm
65
In detritus tanks______________________?
AFlow velocity is kept 0.09 m/sec
BDetention period is kept 3 to 4 minutes
COrganic and inorganic materials are separated
DAll the above
66
The screens are fixed___________________?
APerpendicular to the direction of flow
BParallel to the direction of flow
CAt an angle 30ยฐ to 60ยฐ to the direction of flow
DNone of these
67
Pathogens (or pathogenic bacterias) in water may cause___________________?
ATyphoid
BCholera
CDysentery
DAll the above
68
For non-scouring velocity 5 m/sec, the type of sewers generally preferred to, is____________________?
ACast iron sewers
BCement concrete sewers
CGlazed bricks sewers
DStone ware sewers
69
The width of a settling tank with 2 hour detention period for treating sewage 378 cu m per hour, is __________________?
A5 m
B5.5 m
C6.5 m
D7 m
70
The normal values of over flow rates for secondary sedimentation tanks, ranges between__________________?
A25,000 to 35,000 litres/sqm/day
B40,000 to 50,000 litres/sqm/day
C50,000 to 60,000 litres/sqm/day
D80,000 to 10,000 litres/sqm/day