Pakistan's Largest MCQs Website β€” NTS, FPSC, PPSC, BPSC, SPSC Tests

🌲Forestry MCQs

Forestry MCQs

498 MCQs
251

Watershed management planning phases is / are:

AReconnaissance Survey
BLocal or watershed level survey
CWatershed inventory
DAll of the above
252

The inventory should include the collection of data requirements are:

APhysical, climatic, edaphic, geologic, biotic
BLand used and land capability
CSocio-economic data
DInstitutional and cultural factors E. All of the above
253

Selection of the β€œbest” alternative should be based on several factors:

ATechnical soundness of the plan
BAvailable resources in terms of funding, manpower, infrastructure, etc.
CInstitutional (legal, political) potential for success
DAll of the above
254

Watershed works plan – A detailed plan of operation should be developed which permits a timely, appropriately funded (quarterly, annually, etc.) operation of the plan. The plan should include details of:

AObjectives and goals of the plan
BThe sequence of operations and procedures
CProcedures to be used for the various segments of the plan
DTime schedule while includes realistic flow from one operational sequence to another E. All of the above
255

Range improvement techniques are:

ARange reseeding
BRange burning
CRange fertilization
DStock water development E. All of the above
256

Range reseeding is:

A& (
BD. None of these
CBoth (
257

Stock water development is:

ATobas
BKarez
CSmall dams
DSpring E. All of the above
258

How plants tolerate grazing are:

APosition of apical bud of bud is at surface level more resistant
BHigh portion of flowering to vegetative stems
CDelay in elevation of apical bud
DSprout freely from axillary bud E. All of the above
259

Creation of Public awareness of the problem is / are:

A& (
BD. None of these
CBoth (
260

The use of incentives approaches is / are:

A& (
BD. None of these
CBoth (
Page 26 of 50

Other Categories