π²Forestry MCQs
Forestry MCQs
498 MCQs251
Watershed management planning phases is / are:
AReconnaissance Survey
BLocal or watershed level survey
CWatershed inventory
DAll of the above
252
The inventory should include the collection of data requirements are:
APhysical, climatic, edaphic, geologic, biotic
BLand used and land capability
CSocio-economic data
DInstitutional and cultural factors E. All of the above
253
Selection of the βbestβ alternative should be based on several factors:
ATechnical soundness of the plan
BAvailable resources in terms of funding, manpower, infrastructure, etc.
CInstitutional (legal, political) potential for success
DAll of the above
254
Watershed works plan β A detailed plan of operation should be developed which permits a timely, appropriately funded (quarterly, annually, etc.) operation of the plan. The plan should include details of:
AObjectives and goals of the plan
BThe sequence of operations and procedures
CProcedures to be used for the various segments of the plan
DTime schedule while includes realistic flow from one operational sequence to another E. All of the above
255
Range improvement techniques are:
ARange reseeding
BRange burning
CRange fertilization
DStock water development E. All of the above
256
Range reseeding is:
A& (
BD. None of these
CBoth (
257
Stock water development is:
ATobas
BKarez
CSmall dams
DSpring E. All of the above
258
How plants tolerate grazing are:
APosition of apical bud of bud is at surface level more resistant
BHigh portion of flowering to vegetative stems
CDelay in elevation of apical bud
DSprout freely from axillary bud E. All of the above
259
Creation of Public awareness of the problem is / are:
A& (
BD. None of these
CBoth (
260
The use of incentives approaches is / are:
A& (
BD. None of these
CBoth (